Restacked rock entry to SBAT and raked from bench north of Skipton Lane crossing to the turn to the west following the ravine (about 750 feet past bench)

Gave 3.50 hours on 04/01/2020 with Bike Alliance of Northwest Arkansas, Friends of Arkansas Singletrack - FAST
Dan McCaherty
Barton Fogleman

Raking on SBAT done from south beginning to first Bench seat north of Skipton Lane crossing.
Tried to shore up a washout on the north side of a ridge before the creek crossing north of that bench.

Gave 4.50 hours on 03/25/2020 with Bike Alliance of Northwest Arkansas, Friends of Arkansas Singletrack - FAST
Dan McCaherty
Chris Stockman
Barton Fogleman

Raked another section of the SBAT from the Skipton Lane crossing south towards where I worked the day before. (Still about 200 feet needs raking to connect the two raked sections)

Gave 2.30 hours on 03/22/2020 with Bike Alliance of Northwest Arkansas, Friends of Arkansas Singletrack - FAST
Edward Tremmel
Sara Connors

Cleaned out leaved and rocks on Tunnel Vision section from Tanyard Creek waterfall. Will continue on to Lancashire once rain stops.

Gave 3.00 hours on 03/21/2020 with Friends of Arkansas Singletrack - FAST
Barton Fogleman

Worked on SBAT Trail. Raked on southern portion of Trail north of Grosvenor crossing from where I stopped last to a bit past the ‘washout area’ south of Skipton Lane and high above Grosvenor. Repaired wash-out as best I could.

Gave 2.25 hours on 03/20/2020 with Bike Alliance of Northwest Arkansas, Friends of Arkansas Singletrack - FAST
Edward Tremmel
Chris Stockman
Chris Stockman
Barton Fogleman

Began raking on the SBAT Trail at the southern end by the Trafalgar crossing moving north across Pinion Creek and Grosvenor past the next creek crossing and up the rise until the trail turns east.

Gave 2.70 hours on 03/15/2020 with Bike Alliance of Northwest Arkansas, Friends of Arkansas Singletrack - FAST, WalmartGivesNWA
Barton Fogleman

Walked Brittany Dam connector trail and removed large rocks, limbs, and some leaves.
Did a bit of esthetic work where it connects to the Pinion Creek Trail.

Gave 1.00 hour on 03/05/2020 with Bike Alliance of Northwest Arkansas, Friends of Arkansas Singletrack - FAST, WalmartGivesNWA
Barton Fogleman

Walked SBAT from Bedford Crossing to Bear Hollow Trailhead removing problem rocks, limbs, etc. Filled wash-out hole that is below the switchback descent just north of Bedford Crossing. Used lots of larger rocks to fill this to keep someone from dropping a wheel into this leaf covered hazard. Also severed in several places the monster Poison Ivy vine that is all over a tree next to the descent just north of the Lancashire Crossing. Hopefully this will keep it from stretching those nasty leaves into the mtb path this year.

Gave 2.00 hours on 03/04/2020 with Bike Alliance of Northwest Arkansas, Friends of Arkansas Singletrack - FAST, WalmartGivesNWA
Barton Fogleman

Walked SBAT from Bedford Crossing to Bear Hollow Trailhead removing problem rocks, limbs, etc. Filled wash-out hole that is below the switchback descent just north of Bedford Crossing. Used lots of larger rocks to fill this to keep someone from dropping a wheel into this leaf covered hazard. Also severed in several places the monster Poison Ivy vine that is all over a tree next to the descent just north of the Lancashire Crossing. Hopefully this will keep it from stretching those nasty leaves into the mtb path this year.

Gave 2.00 hours on 03/04/2020 with Bike Alliance of Northwest Arkansas, Friends of Arkansas Singletrack - FAST, WalmartGivesNWA
Michael Harris