Skip to Main Content

FAST Trail Adoption Program - TAP


Barton Fogleman

Worked on SBAT Trail- repaired muddy drainage crossing just north of Grosvenor. Removed some fallen tree segments, etc from the waterfall north of the first creek crossing north of Grosvenor. Scouted SBAT from Grosvenor to the ‘Dragon Tree’ south of the Bedford Crossing, removing limbs and large rocks from the trail and scratching open trail drains where needed.
Trail will need leaves raked pretty soon.

Gave 5.00 hours on 02/27/2020 with Bike Alliance of Northwest Arkansas, Friends of Arkansas Singletrack - FAST, WalmartGivesNWA
Barton Fogleman

More gravel and rock work on the southern entry to the SBAT Trail. Improved a portion where the trail drops down from Avenby to the Pinion Creek bed. Towards the bottom of this slope the trail had begun to fill on the upper side resulting in a narrow downhill slope—I widened and flattened the trail in this area and shored up the downhill side with a large flat rock and gravel where it had been washing. Also moved some creek gravel and sand to improve the area where the trail rises out of the creek bed heading north towards Grosvenor.

Gave 1.75 hours on 02/26/2020 with Bike Alliance of Northwest Arkansas, Friends of Arkansas Singletrack - FAST, WalmartGivesNWA
Barton Fogleman

Worked some more on southern entry to SBAT Trail from Trafalgar to Pinion Creek crossing. Shored-up new rock ‘wall’ off Avenby and added a rock line opposite the ‘wall’ to better define the entry line. Put a bit more gravelly ‘creek sand’ on this small section also.

Gave 2.00 hours on 02/22/2020 with Bike Alliance of Northwest Arkansas, Friends of Arkansas Singletrack - FAST, WalmartGivesNWA
Barton Fogleman

Worked on the South entry to the SBAT Trail to better define the route to the Pinion Creek crossing. Also began building a rock wall to mark where the trail drops from the dirt lane down into the creek.

Gave 2.50 hours on 02/19/2020 with Bike Alliance of Northwest Arkansas, Friends of Arkansas Singletrack - FAST, WalmartGivesNWA
Kelly Cowan
Joshua Johnson

I enjoyed being on the volunteer side to the event. I felt like I was giving back to an organization that has given so much to the trails and NWA.

Gave 3.00 hours on 01/26/2020 with Bike Alliance of Northwest Arkansas, FAST Trail Adoption Program - TAP, Friends of Arkansas Singletrack - FAST
GivePulse profile picture of Anya Bruhin Anya Bruhin  3 weeks ago
Gah! Josh, thank you SO much for helping out!
Tony Guppy

Headwaters Challenge

Gave 4.00 hours on 01/25/2020 with Ozark Off-Road Cyclists, Bike Alliance of Northwest Arkansas, Friends of Arkansas Singletrack - FAST, FAST Trail Adoption Program - TAP, WalmartGivesNWA
Keln Taylor

Gave 4.50 hours on 01/24/2020 with Bike Alliance of Northwest Arkansas, FAST Trail Adoption Program - TAP, Friends of Arkansas Singletrack - FAST
Tony Guppy

Headwaters Challenge

Gave 4.50 hours on 01/24/2020 with Ozark Off-Road Cyclists, Bike Alliance of Northwest Arkansas, Friends of Arkansas Singletrack - FAST, FAST Trail Adoption Program - TAP, WalmartGivesNWA
Todd Earhart
Brad Sandison
Dan McCaherty
Lucas Byrne
Dan McCaherty
Barton Fogleman

Removed limbs, etc. and large rocks from SBAT Trail. Scratched open a few drains too.

Gave 2.25 hours on 12/01/2019 with Bike Alliance of Northwest Arkansas, Friends of Arkansas Singletrack - FAST, WalmartGivesNWA
Keln Taylor
Landon Schrock

Cleared the fall leaves off the section between Chelsea and Basildon drive. Nice weather!

Gave 1.40 hours between 11/18/2019 and 11/19/2019 with Friends of Arkansas Singletrack - FAST
Kelly Jo King

Beautiful day today. Worked on Sugar Creek Bike Trail Route #17. Raked leaves off trail .5 miles and then did spot cleanup on the remaining 2.5 miles. Walked the entire trail from Forest Hills Boulevard to Mace Lane. Tree down 0.23 miles, reported on Facebook. Awesome views of Sugar Creek today!

Gave 3.00 hours on 11/10/2019 with Bike Alliance of Northwest Arkansas, Friends of Arkansas Singletrack - FAST, WalmartGivesNWA
Todd Earhart