This Impact is private
Checked SBAT at its southern beginning where it crosses the Pinion Creek (overflow?) and restored the rock piles marking the entry to and exit from the creek bed. Also removed some limbs that had fallen or washed onto the ‘path’ across the creek.
Also I noticed the large flat rocks I had placed on the downhill slope beside the creek bed entry from the south to armor it against erosion had been washed down to the bottom of that slope and professional repair is needed before the next flood to keep that sloped trail from washing out.